A grant was given in 2020 to Inspire S-VE to offset the total cost of installing an asphalt parking area at the building used by many community residents, many being elderly. The parking area was rough, muddy and full of holes. The project took longer than expected but was completed in 2022. Photos of the before and after show the scope of the improvements.
Before:
After: